Saturday 24 December 2016

Tuesday 20 December 2016

Actor Release Form

This is the Actor Release Form template. We are planning to use this for our production, we will send it to both of our actors as a form of permission. This document should be sent off today, which means we will get the form back soon. After we get the form back fully completed it will enable us to reassure our filming dates, and start our shooting schedule. 

Summary by:Doaa Elmanyneh and Zacaria Elarichi 

Saturday 17 December 2016

Shooting Schedule- Draft 1

DATE
SCENE
INT/EXT
DAY/NIGHT
SHOT DESCRIPTIONS SUMMARY
LOCATION
CHARACTERS
EQUIPMENT/PROPS/COSTUMES/ SPECIAL REQUIREMENTS.
4TH & 5th January 2017 26th and 27th of January if needed.
Shot 1 – 18
DAY
1.     Sound/ glitch effects at the start of the music video. Duration roughly two seconds.
2.     Time lapse of the London skyline which is shot in the Sky tower.  Duration roughly two seconds.
3.     Establishing shot showing abandoned building and or location of the scene ( Brentford bridge)
4.     Long shot of showing the bridge in a narrow perspective. (duration roughly 1 second) 
5.     Wide angle shot of the bridge and canal which will include gradual zoom effect.
6.     Medium close up of main characters back looking into the water. This will include (cutting to the beat task)
7.     Over the shoulder/medium shot to show location of Brentford bridge.
8.     Medium shot showing the Polaroid picture in the hand of the main actor.
9.     Low angle shot of the actors back picking up his back pack.
10.                         Medium shot of the actors back towards the camera walking away with the back pack.
11.                        Low angle shot of the feet of or actor walking away from the initial scene through an alleyway.
15. Wide shot of the actor walking through the alley way
17. Another wide shot of the scenery and abandoned surroundings around the actor.
Brentford Bridge
Ahmed
-         Camera
-         Tripod
-         Hoodie
-         Facemask
-         Backpack
-         Polaroid picture

8th-9th January 2017
Shot 19- 35 
Day
-         Camera
-         Tripod
-         Backpack
-         Face mask
-         Hoodie

10th-11th January 2017 (24th-25th if needed)
Shot 34 - 47
Night
-         Face Mask
-         Tripod
-         Camera
-         GoPro
-         Backpack

13th – 14th January 2017
60 - 81
Day
-         Camera
-         Tripod
-         Roller-skates
-         Face mask
-         Backpack

16th- 17th January 2017
81- 112. 
Day
-         Face mask
-         Polaroid picture
-         Backpack
-         Camera
-         Tripod








Summary by: Doaa Elmnaynrh, Jack Baxter and Zacria Elarichi

Thursday 15 December 2016

Location Release Form

I have created this Location Release Form, we decided to do this as it will enable us to gain permission for transport filming such as inside the bus. this will be important as we have mentioned previously in our research, in order to re-ensure safe environment. We are planning to film during off-peak hours this is so we avoid large crowds, as this may result in various risks. In addition, we are planning to ask for the permission shortly this week, which will enable us to have time to plan the shooting schedule and make confident decisions about dates of filming. Not only that, but this will surely benefit our time management.

Friday 9 December 2016

Group Work- Storyboard Final Draft

This was out final draft of the story board. We collectively discussed that there won’t need to be any additional improvement that we want to make to the storyboard due to putting a lot of time and effort in to it. We assume this is a very strong structure of the storyboard which will allow us to create a very adequate recording schedule as well as enabling us to film the scenes. There could be some improvements that we could possibly make during recording time but that all depends on how the filming goes. The main objective is to record all the shots which are shown below. However that doesn't mean we have to follow the plan and limit ourselves to the minimum as we can record other shots which possibly can help us during the editing process. This would save us a lot of time instead of going back to the locations and redo the shooting parts as we can just use the extra shots we have filmed which are not in the story board.

Additionally, within our storyboard, we have included detailed notes about the shots that we have chosen and their effect. The annotation of each shots are developed even more in the script. We have also made a timeline assisting us as it will tell us when we want our shots to start and finish. This is useful as it would help us a lot in the editing process.









Summary by: Doaa Elmnayneh, Jack Baxter, Zacaria Elarichi and Momeena

Monday 5 December 2016

Thursday 1 December 2016

Group Work- Budget Improvment

Below is the first attempt at creating our budget, The budget is an important piece if information in which we will need to contemplate while making the music video and therefore I have created a excel document in which shows us the different costs that will be involved while making the video. I have chosen to use Microsoft excel as this is a programme in which I believe allows me to best share this information. The Miscellaneous tab is purely for the flare and the other props which will need to be brought at a later date. Overall this task has allowed us to create a budget which will allow us to get a guideline upon how much money we will need to spend each when venturing out on these dates. When buying the flare the total price was £12, the contribution per group member was 
Doaa:£4
Zacaraia:£4
Jack:£4
Momeena:£0

  
Summary by: Jack Baxter